If you are buying or specifying fire rated portable cabins for a construction project, the required fire performance will depend on where and how the units are installed.

Portable cabins are widely used as site offices, welfare units, canteens, changing rooms, stores and temporary accommodation. But where they are used on construction projects, fire performance can become an important part of the specification depending on where and how the units are installed.

Terms such as fire rated, 30-minute fire resistance, REI, JCoP and HSG168 are often used when temporary buildings are specified or advertised. They do not all mean the same thing, and a cabin described simply as “fire rated” is not automatically suitable for every site or installation.

The fire-performance requirements for a portable or modular building can be influenced by factors including:

  • how close it will be positioned to the building under construction or refurbishment;
  • whether cabins will be vertically stacked;
  • the construction and materials used in the unit;
  • the fire performance of walls, floors, roofs, doors, windows and supporting members;
  • whether the accommodation will be installed inside another structure;
  • and the project-specific fire risk assessment.

For construction projects, two particularly important sources of guidance are the Joint Code of Practice on the Protection from Fire of Construction Sites and Buildings Undergoing Renovation, commonly referred to as JCoP, and the Health and Safety Executive’s HSG168 – Fire Safety in Construction.

The current JCoP Edition 10.2 replaced Edition 10.1 in July 2025. It contains specific requirements relating to temporary buildings, including portable cabins, modular buildings, site huts and containers used during construction works.

HSG168 also contains specific guidance for temporary accommodation units used as offices, canteens and welfare facilities on construction sites. It states that these units should be subject to a specific fire risk assessment, with additional precautions required as the size and complexity of the accommodation increase.

For buyers, the important point is that fire performance should be considered before selecting a particular cabin, especially where units will be stacked, positioned close to construction works or used on a project where JCoP compliance forms part of the insurance or contractual requirements.

For wider advice on condition, size, transport, value and choosing the right unit, see our Complete Guide to Buying a Used Portable Cabin in the UK.

If you are also considering where a cabin can be positioned or whether planning consent may be required, see our guide Do You Need Planning Permission for a Portable Cabin in the UK?

What Does “Fire Rated” Mean for a Portable Cabin?

There is no single universal specification called a “fire-rated portable cabin”.

Fire resistance relates to the performance of particular elements of a building when exposed to fire and, importantly, what those elements have actually been tested or assessed to achieve.

One classification buyers may encounter is REI:

R – Load-bearing capacity
The ability of a structural element to continue carrying the required load during fire exposure.

E – Integrity
The ability of the construction to resist the passage of flames and hot gases for the stated period.

I – Insulation
The ability of the construction to restrict the temperature rise on the side not exposed to the fire.

A specification described as 30-minute REI therefore refers to 30 minutes of assessed fire performance for load-bearing capacity, integrity and insulation for the relevant construction element.

This distinction matters because different parts of a temporary building can require different fire-performance characteristics. A wall, floor, roof, door, window or supporting member should not be assumed to have the same rating simply because another part of the cabin has been tested.

HSG168 specifically requires vertically stacked temporary accommodation units to have suitable protection providing a minimum of 30 minutes’ fire resistance for the roof/floor assembly and supporting members, covering integrity, insulation and load-bearing capacity.

Buying point: Do not rely solely on the words “fire rated” in an advert or specification. Where fire performance is important, establish exactly which elements have been tested or assessed, to what standard, for how long and for what intended configuration.

What Is JCoP and When Does It Apply?

The Joint Code of Practice on the Protection from Fire of Construction Sites and Buildings Undergoing Renovation, usually shortened to JCoP, provides fire-prevention guidance for construction projects and buildings undergoing refurbishment.

The current Edition 10.2 includes specific requirements for temporary buildings and temporary accommodation used during construction works. This includes buildings such as:

  • portable cabins;
  • modular and sectional buildings;
  • site huts;
  • cargo containers;
  • offices;
  • stores;
  • workshops;
  • and welfare facilities.

JCoP applies to projects where temporary site accommodation is used on a main construction contract valued at £2.5 million or more. It can also apply to lower-value contracts where they form part of a larger construction project.

Compliance with JCoP is also commonly linked to the project’s insurance requirements. Where compliance forms part of the insurance contract, failure to follow the Code can potentially affect the availability of that insurance.

For buyers and suppliers of portable buildings, this is important because JCoP can influence what type of cabin is suitable, how it is constructed and where it can be positioned on site.

A standard portable cabin may be perfectly suitable when positioned with sufficient separation from the construction works. The same unit may not be suitable if it needs to be installed closer to the building, vertically stacked or positioned above part of the site without the required fire-performance certification.

This is why JCoP should be considered as part of the site layout and cabin specification, rather than simply asking whether a cabin is “fire rated”.

What Is HSG168 and How Does It Relate to JCoP?

HSG168 – Fire Safety in Construction is guidance published by the Health and Safety Executive for managing fire risk on construction sites.

It covers a wide range of fire-safety issues, including temporary accommodation, means of escape, fire detection, emergency arrangements, combustible materials, temporary electrical installations and site management.

For portable cabins, one of the most relevant parts of HSG168 is its guidance on temporary accommodation units used as offices, canteens and welfare facilities.

HSG168 makes clear that temporary accommodation should be included within the project’s site-specific fire risk assessment and that the precautions required will depend on the size, complexity and arrangement of the accommodation.

It also places particular emphasis on vertically stacked units. Where temporary accommodation is stacked, HSG168 requires the relevant roof/floor assembly and supporting members to provide a minimum of 30 minutes’ fire resistance for load-bearing capacity, integrity and insulation.

How Is HSG168 Different From JCoP?

HSG168 and JCoP overlap in several important areas, but they are not the same document.

HSG168 is HSE guidance covering fire safety during construction work more broadly.

JCoP is the Joint Code of Practice on the Protection from Fire of Construction Sites and Buildings Undergoing Renovation. It contains more specific requirements for projects within its scope and is particularly significant where compliance forms part of the project’s contractual or insurance requirements.

Both documents address temporary buildings and fire risk, but JCoP goes further in areas such as:

  • fire-break distances;
  • enhanced fire-performance requirements for units positioned within the fire-break zone;
  • vertically stacked accommodation;
  • external walls, roofs and structural elements;
  • fire-rated openings and penetrations;
  • insulation and reaction-to-fire requirements;
  • and fire-detection arrangements for higher-risk installations.

For buyers, the practical point is that HSG168 and JCoP should not be treated as interchangeable labels.

A cabin described as “HSG168 compliant” or “JCoP compliant” still needs to be assessed against the actual site layout, intended use, fire-risk assessment and available supporting evidence.

Buying point: The safest approach is to establish which guidance or contractual requirements apply to the project first, then confirm that the proposed cabin specification and supporting documentation meet those requirements.

Why Does the Distance Between the Cabin and the Building Matter?

One of the key principles within JCoP is the use of a fire break between temporary accommodation and the building under construction or refurbishment.

The guidance recommends providing as wide a separation as reasonably practicable, with an aim of approximately 10 metres. Where this cannot reasonably be achieved, the fire break should wherever practicable be at least 6 metres.

Where the appropriate separation can be maintained, ordinary non-stacked temporary buildings may not require the enhanced fire-resistant construction required for units positioned inside the fire-break zone.

Where a cabin has to be positioned within 6 metres, additional fire-performance requirements can apply to the building itself.

The separation requirement can also increase on higher-risk projects, such as certain large timber-frame structures.

Buying point: Before choosing a cabin, establish where it will actually sit in relation to the construction works. The required fire performance can change significantly simply because the available site layout moves the accommodation from outside the fire-break zone to inside it.

Fire rated portable cabins and JCoP fire-break guidance showing 10m, 6m and 20m separation distances
JCoP Edition 10.2 fire-break guidance for temporary buildings and portable cabins. Project-specific requirements and fire risk assessments should always be confirmed

What Happens When a Cabin Is Within 6 Metres?

Where the recommended fire-break distance cannot be achieved, the fire performance required from the temporary building becomes much more important.

Under the current JCoP Edition 10.2, new temporary buildings intended for use within the 6-metre fire-break zone must be designed and constructed to meet enhanced fire-performance requirements.

These requirements go beyond simply specifying a cabin as “fire rated”. Depending on the construction and configuration, they can include requirements for:

  • 30-minute fire resistance of relevant floor, wall and roof assemblies;
  • appropriate fire performance of supporting structural members;
  • fire-resistant doors, windows and shutters;
  • fire stopping around service penetrations such as cables, pipework and ventilation;
  • materials with specified reaction-to-fire classifications;
  • suitable insulation materials within external walls and roofs;
  • fire detection systems;
  • and measures to prevent combustible waste accumulating beneath raised units.

For vertically stacked or multi-storey accommodation, the relationship between the lower unit’s ceiling and the upper unit’s floor becomes particularly important. The relevant floor/roof assembly must achieve the required performance for load-bearing capacity, integrity and insulation — REI.

Doors, windows, shutters and certain penetrations have their own requirements and should not simply be assumed to comply because the wall or roof construction has been fire tested.

JCoP also requires consideration of the materials used within the temporary building. The objective is not only to resist the spread of fire but also to avoid materials that significantly contribute to fire growth, smoke production or hazardous fumes.

Fire Detection

Temporary accommodation positioned within the fire-break zone must also have appropriate fire detection.

On higher-risk sites, additional requirements can apply, including linking the temporary accommodation fire-detection system with the fire alarm serving the construction project.

This reinforces an important point for buyers: fire compliance is a system of construction, testing, siting and fire-safety measures — not a sticker applied to a cabin.

Before purchasing a cabin intended for use within the fire-break zone, ask the seller or manufacturer what test evidence, assessment reports and certification are available for the relevant walls, roof, floor, supporting structure, doors and windows.

Buying point: If the proposed site layout places the accommodation inside 6 metres of the construction works, establish the required specification before purchasing. Retrofitting an unsuitable standard cabin to satisfy the project’s fire requirements may be impractical or uneconomic.

What Are the Fire Requirements for Stacked Portable Cabins?

Vertically stacked portable cabins require particular attention because the fire risk is different from a single-storey installation.

Under the current JCoP Edition 10.2, additional requirements apply to all vertically stacked temporary buildings, even where they are positioned more than 6 metres from the building under construction.

The lower roof and upper floor assembly must achieve 30 minutes’ fire resistance for load-bearing capacity, integrity and insulation — REI. The supporting members carrying that assembly, such as legs, columns or load-bearing walls, must also achieve the required fire-resistance performance.

HSG168 gives the same underlying requirement for vertically stacked temporary accommodation units. It states that the roof/floor assembly and supporting members must provide a minimum of 30 minutes’ fire resistance to help prevent fire spread and structural collapse within the stack.

This requirement matters because a fire affecting a lower unit can compromise the accommodation above it. Fire performance therefore has to address not only the spread of flame and heat, but also whether the supporting structure continues to carry the load for the required period.

Does the 6-Metre Fire Break Still Matter for Stacked Cabins?

Yes — but stacking creates an additional requirement.

A non-stacked cabin positioned outside the applicable fire-break zone may not require the same enhanced fire-resistant specification as a unit positioned closer to the construction work.

A stacked cabin is different. Even where the stack is outside the normal 6-metre fire-break zone, the relevant roof/floor assembly and its supporting members still require the specified 30-minute fire performance.

Where stacked accommodation is also positioned within 6 metres, the wider JCoP 10.2 requirements for temporary buildings inside the fire-break zone must also be considered, including the performance of external walls, roofs, openings, service penetrations, insulation and fire detection systems.

Buying point: If you are buying cabins that may later be used in a two-storey or multi-storey arrangement, do not assume that any standard cabin can simply be stacked. Ask for evidence covering the roof/floor assembly and supporting structure in the stacked configuration, not just a generic statement that the cabin is fire rated.

What Evidence Should a Buyer Ask for Before Purchasing a Fire-Rated Cabin?

If fire performance is important to the proposed use, the buyer should ask for evidence that relates to the actual cabin construction being offered, rather than relying on a broad description such as “fire rated” or “JCoP compliant”.

Useful evidence can include:

  • fire-test reports for the relevant wall, roof or floor construction;
  • assessment reports where permitted;
  • certification showing the applicable fire-resistance classification;
  • evidence relating to doors, windows and other openings;
  • details of the insulation and internal lining materials used;
  • evidence for supporting members where cabins will be stacked;
  • drawings or build specifications showing that the tested construction matches the unit being supplied;
  • and any relevant manufacturer declaration identifying the intended configuration or limitations of use.

The important question is not simply “does this cabin have a fire certificate?” but:

What exactly has been tested, to which standard, for how long, and does that evidence apply to this unit in the way I intend to use it?

Why the Detail Matters

A fire-test result may apply only to a particular wall build-up, door type, floor construction or structural arrangement.

If a cabin has subsequently been modified — for example by adding windows, changing doors, cutting service penetrations or altering internal linings — those changes may affect whether the original evidence still applies.

The same principle applies to used cabins. Age alone does not automatically make a fire-rated cabin unsuitable, but buyers should establish whether the unit still matches the construction covered by the available test or assessment documentation.

Where there is any doubt, the project fire-risk assessment or competent fire adviser should determine whether the available evidence is sufficient for the proposed installation.

Buying point: For a fire-sensitive project, documentation should be treated as part of the asset. A cabin with clear, traceable evidence can be considerably easier to specify and approve than a visually similar unit with no supporting records.

Does a Used Fire-Rated Cabin Still Comply?

Potentially — but this should never be assumed.

A used cabin may still retain the fire-performance characteristics of its original construction, provided it has not been modified or deteriorated in a way that compromises the tested or assessed specification.

Before purchase, check for:

  • replacement doors or windows;
  • damaged or missing fire-stopping;
  • unsealed cable or pipe penetrations;
  • changes to wall or ceiling linings;
  • corrosion or structural damage affecting supporting members;
  • alterations to floors or roof assemblies;
  • and any refurbishment work that may have changed the original construction.

Where original certification is available, compare the current unit against the documented specification as closely as possible.

For higher-risk projects, or where JCoP compliance forms part of the contractual or insurance requirements, the suitability of a second-hand cabin should be confirmed through the project’s fire-safety process rather than assumed from its previous use.

Buying point: A used cabin can represent excellent value, but on a fire-sensitive project the condition and documentary history of the unit are just as important as the advertised specification.

Fire Safety and Site Layout

The fire performance of a portable cabin cannot be considered in isolation from the way the site is arranged.

Even where the cabin itself has appropriate fire-resistance characteristics, poor positioning, combustible storage or obstructed access can increase the overall fire risk.

Keep Fire-Break Areas Clear

Where a fire break is being relied upon, the separation distance needs to remain genuinely clear.

JCoP guidance requires fire-break areas to be kept free from combustible materials. Timber, waste, packaging, fuel, stored equipment or other combustible items should not be allowed to accumulate within the separation zone.

This means the fire break is not simply a measurement shown on a site drawing. It has to remain effective throughout the project.

Prevent Waste Accumulating Beneath Cabins

Portable and modular buildings are often installed above ground level on blocks, pads, steelwork or supporting frames.

This can create a void beneath the accommodation where packaging, timber, rubbish and other combustible materials can collect.

For new temporary buildings designed for use within the 6-metre fire-break zone, JCoP 10.2 requires a site-fitted skirt between ground level and the lowest floor to prevent rubbish accumulating beneath the units.

The enclosure still needs to be considered as part of the overall building and site design, including any ventilation requirements.

Consider Stairs, Walkways and Access

Multi-storey cabin installations can include external stairs, landings and walkways.

Where accommodation is being designed for use within the fire-break zone, JCoP 10.2 also sets reaction-to-fire requirements for external walls, walkways and stairs.

From a wider site-safety perspective, access routes and escape routes should remain unobstructed and suitable for the number of people using the accommodation.

Use Cabins Only for Their Intended Purpose

HSG168 specifically warns against using temporary accommodation for purposes it was not designed for.

For example, an office should not become an informal store for paint, fuel or other flammable materials simply because spare space is available.

Materials should also not be stored on top of temporary accommodation units, both to avoid increasing the fire load and to prevent damage to structural components.

Fire Risk Assessment Remains Essential

The final site arrangement should form part of the project-specific fire risk assessment.

That assessment should consider the cabins themselves alongside:

  • the type of construction work taking place;
  • nearby ignition sources;
  • combustible materials;
  • temporary electrical installations;
  • heaters and cooking equipment;
  • escape routes;
  • fire detection and alarm systems;
  • firefighting equipment;
  • and the changing layout of the site as the project progresses.

A cabin that is entirely suitable in one position may require a different specification if the site layout changes.

Where the proposed position or use of the cabin may also affect planning requirements, see our guide Do You Need Planning Permission for a Portable Cabin in the UK?

Buying point: When purchasing portable accommodation for a construction project, establish not only what the cabin is, but where it will be positioned, what will surround it and how the site will operate around it.

Who Is Responsible for Fire Safety on Site?

Buying a cabin with the appropriate fire-performance specification does not transfer responsibility for fire safety away from those managing the construction project.

Under the Construction (Design and Management) Regulations 2015 (CDM), responsibility for managing construction-site risks is shared between the relevant dutyholders.

Where a project involves more than one contractor, the principal contractor has a key role during the construction phase. HSG168 states that the principal contractor should ensure that a site-specific fire risk assessment forms part of the construction phase plan and that appropriate fire-prevention and mitigation measures are implemented, maintained and reviewed.

Contractors must also manage the risks created by work under their control and co-operate with the principal contractor and others working on the site.

Workers have responsibilities too, including following site fire and emergency procedures and reporting hazards or deficiencies they identify.

This means responsibility extends beyond the manufacturer or seller of the temporary accommodation.

A supplier may be able to provide information about the cabin’s construction, materials, fire testing and certification, but the project team must determine whether that specification is suitable for the proposed location and use.

The fire risk assessment should therefore consider the cabin alongside the wider site, including:

  • its position and separation from construction works;
  • whether units are stacked;
  • escape routes and occupancy;
  • fire detection and alarm arrangements;
  • temporary electrical installations and heating;
  • combustible storage and waste;
  • changes to the site as construction progresses;
  • and the available evidence supporting the cabin’s fire performance.

Where specialist advice is required, the project should involve an appropriately competent fire-safety professional.

Buying point: The seller should be able to explain and evidence what the cabin is designed to achieve. The project dutyholders remain responsible for deciding whether that cabin is suitable for the proposed installation and managing the fire risk once it is on site.

Buying Fire-Rated Portable Cabins Through Cabin Trader

When searching for a portable cabin for a project where fire performance matters, start with the site requirement rather than the advert description.

Before committing to a unit, establish:

  • whether JCoP, HSG168 or another project-specific requirement applies;
  • where the cabin will be positioned;
  • whether it will be vertically stacked;
  • what fire-resistance performance is required;
  • which parts of the cabin need to achieve that performance;
  • and what test reports, assessments or certification are available to support the specification.

Cabin Trader provides an independent marketplace where buyers can compare portable cabins, welfare units, modular buildings and other temporary accommodation offered by different sellers across the UK.

The specification and supporting documentation can vary considerably between individual units, particularly when buying used stock. Where fire performance is important, buyers should discuss the intended application with the seller and request the relevant technical evidence before purchasing.

You can browse portable cabins currently available on Cabin Trader and compare suitable stock from different sellers.

For wider guidance on assessing condition, specification, value and transport before purchasing, see our Complete Guide to Buying a Used Portable Cabin in the UK.

Final Point

A portable cabin should not be considered suitable for a fire-sensitive project simply because it is described as “fire rated”, “JCoP compliant” or “HSG168 compliant”.

The correct specification depends on the cabin, its construction, its supporting evidence, the proposed site layout and the project-specific fire risk assessment.

Establish the requirement first — then select the cabin that can demonstrate it meets that requirement.